API 2000 Venting

Happy New Year! I will be trying to keep my New Year's resolution to blog more frequently. To start the year, let us look at what happens when API 2000 venting requirements are applied to a tank. My concern here comes about because of a tank I just designed for a client. The specifications said this tank was an atmospheric tank. Design and operating pressure are specified as atmospheric. All seems fine until we get futher into the specifications and come across the venting. In this section it was stated that the tank was to meet API 2000 venting requirements and provide the inflow and outflow rates. The rates are quite low as the tank is not very large. Even though the primary vent is to have a flame arrestor, the required pressure to provide the venting required for pressure and vacuum are both less than 1" of water. This had no affect on the tank. However, when we get to emergency venting the specifications said that the pressure required to provide full emergency venting could not exceed the design pressure by more than a certain percentage. Upon contacting the supplier of the emergency vent we discovered that we would have to design the tank for 4" of water pressure to meet this requirement based on the venting capability of the available vents. Needless to say this did have an affect on the tank design. We now have to anchor the tank for pressure where before the tank would not have required anchoring.

Venting requirements and the pressure and vacuum needed to meet these requirements can change the design of your tanks. A tank may be specifed to operate at atmospheric pressure. However, the venting and particular the emergency venting requirements may require the tank to be designed for pressure. Be aware of what pressure is required by the emergency and normal vents to meet the venting capacity. It may start relieving at a relatively low pressure but may require a higher pressure to meet the capacity required.

Tuesday, November 10, 2009

API 650 11th Edition Addendum 2

Addendum 2 to API 650 11th Edition has been released. The effective date for this addendum is May 1, 2010. I will give just a brief overview of some of the bigger changes. I will do a more complete review later. First, they have changed Tables 5-6a and 5-6b and revised the minimum distance from the bottom of the tank to the center of a nozzle for regular type fittings. Snow load requirements have changed such that you now will have to consider both balanced and unbalanced snow loads. In Appendix V that have changed the stability factor such that there are different values depending upon certain conditions. The one that surprised me the most is that they slipped in Appendix Y. This was added after the proof copies were sent out. Appendix Y has added back into the standard the API monogram system. It appears that you can now place the API monogram on a tank nameplate if you have been certified to do so. You may find in the future that some companies will require this certification to be able to bid on and build their tanks. It will be something to watch out for.

Tuesday, October 27, 2009

Seismic Av and TL values

The question comes up as to what is the Av and TL values in our ITSdesign program? These values are listed under the seismic input section on the design page. Av is the vertical acceleration value and is entered as a value of g. This input is different than the Ss and S1 values which are entered as a % of g. In API-650 it is up to the client to specify if a vertical acceleration is to be included in the seismic calculations. If it is, they are to provide this value. In AWWA D100 there is a minimum value that is to be used based on the other seismic values. A client can specify a higher value though.


The second value, TL, is the Region-Dependent Transition Period for Longer-Period Ground Motion. This value depends upon the location of the tank and can be 4, 6, 8, 12, or 16. Areas from Eastern Texas to Eastern Kentucky and from Central Minnesota to the Gulf Coast are listed as a 12. The Northeast states are a 6 while the Southeast states down to Florida are an 8. The Southwest is a 6 and the upper Midwest is a 4. West of the Rocky Mountains it is a 6, 8, 12, or 16 depending upon your location. AWWA D100 printed the map of these values in the seismic section, Section 13 Figure 19. Unfortunately, API 650 did not include this map in their standard. If you do not have the AWWA D100 standard, you would need to look in ASCE7 for this map.

Wednesday, August 26, 2009

Jack Rafter System

We have just released a new version of ITSdesign that has a Jack Rafter System. This allows you to use a single center column on tanks as large as 90' to 100' diameter. With this system half of the rafters go from the center column to the shell. In between each of these Thru Rafters is a Girder that is made from a small channel and is located at approximately the mid point of the Thru Rafter. From the center of the Girder to the shell is placed a Jack Rafter. Thru Rafters get to be quite heavy but the Jack Rafters are relatively small. It does increase the load on the center column and on the soil below the column. However, the cost savings can be significant as you do not need intermediate columns. It also reduces the diameter of the cap plate on the center column considerable. The erection cost for this type of system is less than for one with intermediate columns.

If you haven't downloaded a free trial copy of ITSdesign, do so today and give this new system a try. Just go to www.innnovativetanksolution.com and click on the ITSdesign download button. Follow the instructions for installing the trial program.

Tuesday, June 16, 2009

Frangible Roof Design

Some of you have been asking when we would be releasing a version of ITSdesign with Frangible Roof Designs. We have just released that version. Yes, we now have Frangible Roof Designs in accordance with Addendum 1 of the 11th Edition. There are four different sets of requirements in 5.10.2.6. The first is for tanks that are 50' in diameter or greater. The second is for tanks 30' in diameter but less than 50' diameter and self anchored. The third is for tanks less than 50' in diameter and self anchored (this requires an elastic analysis). The fourth is for tanks of any size that are anchored. ITSdesign includes the first, second, and fourth options.

We continue to add to our program. If you have not seen what our program can do, visit our website at www.innovativetanksolution.com and download a trial version. We look forward to your comments and to the next addition to our program.

Friday, June 12, 2009

API-650 11th Edition Addendum 1 Appendix F

An interesting thing has occurred with the design in API-650 11th Edition Addendum 1 with regard to Appendix F. With the changes, the design is now based on the yield strength of the material. When you look at the formula for P, the internal pressure, you will see that you have AFy which is the area times the yield strength. At first glance you would think that this will help you when you high strength materials. And in reality it does IF the shell, roof, and compression ring are all high strength material. However, if the shell and roof are high strength material and the compression ring is A36 material, then you have the same pressure as before. The yield strength, Fy, in the formula is based on the lowest yield strength of the compression area. Therefore, if the compression ring is the lowest yield strength, then that is the value you use.

An interesting thing occurs when you start looking at the area, A. The amount of area available in the shell and the roof have not changed. Those formulas are not based on the yield strength of the material. What did change is that the amount of area in the horizontal projection of the compression ring is based on the yield strength of the compression ring when the horizontal leg is not stiffened. In the previous editions this value was 16t. Now (in US units) it is the thickness of the material times 3000/(Fy)^0.5. Here is a list of what happens to the horizontal projection allowed (Le) for a thickness of 1/4".

16t = 4"
A36 material (Fy = 36000 psi) = 3.95"
A678A material (Fy = 50000 psi) = 3.35"
A240-304L SS (Fy = 25000 psi) = 4.74"

As you can see, the higher the yield strength of the compression ring, the smaller Le can be which reduces the area, A. Thus, if you used a high strength steel for the compression ring and the shell but used a low strength steel for the roof you will end up with a lower allowed internal pressure because the compression ring will not contribute as much area and the yield strength of the roof will be the governing value for Fy in the pressure formula.

If you really want to scratch your head about something, think about this. I could build a tank using a material with a yield strength of 50000 psi for the shell, roof, and compression ring and have it meet the frangibility requirements of 5.10.2.6. However, that same tank with the same thicknesses using a material with a yield strength of 36000 psi for the shell, roof, and compression ring would not necessarily meet the frangibility requirements of 5.10.2.6 (area of the compression area could be greater for the lower strength material).

Thursday, May 28, 2009

API Committee Meeting

There was a lot of discussion going on at the API Committee Meetings held the end of April. Some of it had to do with floating roofs and some with the wind loadings especially on uplift on the roof. Neither has been resolved and both are on going discussions. They are working on doing some testing for the wind uplift situation to try to resolve the conflicts.

With regard to API-650, the following agenda items were approved for publication.
1) Added shell nozzles in pipe sizes 50", 52", 54", and 60".
2) Added long welding neck flanges and lap joint flanges as acceptable flanges.
3) Revised some dimensions of flush cleanouts.
4) Revised the anchored and unanchored tank calculations in 5.11.2 and 5.11.3 to include a pressure combination factor applied to the internal pressure portion. Also added this factor and revised appropriate equations in Appendix R.
5) Deleted the joint efficiency requirements in the equations in Appendix V.
6) Changed the required dome roof depth in Appendix J to be a "Minimum" depth instead of a "Maximum" depth.
7) Revised Appendix J material reference to read that the material requirements of Appendix A apply as long as the material is 1/2" or less in thickness instead of requiring the material to meet Section 4 requirements.
8) Revised Appendix J to allow thicknesses greater than 1/2" as long as the material requirements of Section 4 are met.

It was also brought up that in some cases the formulas in Appendix P.3 for the curves did not calculate out to the same as values plotted on the curves. After a lot of discussion it was decided to temporarily remove P.3 from the standard until the discrepency can be corrected either in modification of the curves or modification of the formulas.

With regard to upcoming addendums, we were informed that the next addendum for API-650 will be issued sometime this fall and will include all items approved for publication prior to the April meeting. The items approved at the April meeting as well as the next two meetings will be published in the addendum that will be issued in the fall of 2010.